Skip to content

docs(harness): land approved Plan: Gamma Dev Spec#643

Merged
bakeb7j0 merged 1 commit into
mainfrom
docs/642-plangamma-devspec
May 8, 2026
Merged

docs(harness): land approved Plan: Gamma Dev Spec#643
bakeb7j0 merged 1 commit into
mainfrom
docs/642-plangamma-devspec

Conversation

@bakeb7j0
Copy link
Copy Markdown
Contributor

@bakeb7j0 bakeb7j0 commented May 8, 2026

Summary

Lands the formally-approved Dev Spec for Plan: Gamma — Wave-pattern test harness foundation (Epic #626 sub-issue #1) on main. Pre-/prepwaves 641 so /wavemachine has a stable on-disk Dev Spec reference when KAHUNA spins up.

Changes

  • Adds docs/ccwork-testtarget-devspec.md (1508 lines).
  • Carries <!-- DEV-SPEC-APPROVAL approved=true approved_by=BJ approved_at=2026-05-08T05:02:58Z finalization_score=8/8 --> metadata block.
  • 9 sections + Appendices A/V/B; 22 EARS requirements (R-01..R-22); 12 constraints (TC-01..07, PC-01..05); 16 design choices (DC-01..16) indexed at start of §5; 13 deliverables (DM-01..13); 21 Stories across 2 Phases / 9 Waves with depends_on declarations.
  • §8 Story headings backfilled with (#N) linking to Wave-Engineering/ccwork-testtarget#1 through #21.

Cross-repo Plan: Stories execute in Wave-Engineering/ccwork-testtarget; Plan tracking remains in this repo on #641.

phases-waves.json: operator-local state at .claude/status/phases-waves.json (gitignored). Not part of this commit; lives only on each operator's machine that runs the campaign.

Linked Issues

Closes #642

Test Plan

Notes

The 104 pre-existing stale test failures from prior install.sh removal + discord-bot → disc-server refactor + skill-test docs/doc alias mismatch are unrelated to this PR. Same set surfaced on PR #640 (sketchbook landing).

Adds the formally-approved Dev Spec for Plan: Gamma — the wave-pattern
test harness foundation (Epic #626 sub-issue #1). The Dev Spec carries
the DEV-SPEC-APPROVAL metadata block (approved_by: BJ, finalization
score 8/8), elaborates 22 EARS requirements, 12 constraints (TC + PC),
16 design choices (DC), 13 deliverables, and 21 Stories across 2
Phases / 9 Waves with depends_on declarations.

Stories live in Wave-Engineering/ccwork-testtarget#1 through #21
(cross-repo Plan: tracking issue in cc-workflow, execution in
ccwork-testtarget). phases-waves.json is operator-local state under
.claude/status/ (gitignored); not part of this commit.

Closes #642
@bakeb7j0 bakeb7j0 added this pull request to the merge queue May 8, 2026
Merged via the queue into main with commit 2b83e1e May 8, 2026
1 check passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

docs: land approved Plan: Gamma Dev Spec + phases-waves.json on main

1 participant