Skip to content

type: fix inconsistent typing #77

type: fix inconsistent typing

type: fix inconsistent typing #77

Triggered via push September 10, 2025 23:04
Status Failure
Total duration 16s
Artifacts

run-tests.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

4 errors
test (3.11)
Process completed with exit code 1.
test (3.12)
Process completed with exit code 1.
test (3.10)
Process completed with exit code 1.
test (3.10)
The strategy configuration was canceled because "test._3_12" failed