Skip to content

chore(deps): update dependency dotnet.glob to 2.1.4 - abandoned #3059

chore(deps): update dependency dotnet.glob to 2.1.4 - abandoned

chore(deps): update dependency dotnet.glob to 2.1.4 - abandoned #3059

Triggered via pull request February 20, 2026 12:54
Status Cancelled
Total duration 6h 5m 7s
Artifacts

snapshot-verify.yml

on: pull_request
Matrix: verify
Fit to window
Zoom out
Zoom in

Annotations

4 errors
verify (macos-latest)
The job has exceeded the maximum execution time of 6h0m0s
verify (macos-latest)
The operation was canceled.
verify (ubuntu-latest)
The job has exceeded the maximum execution time of 6h0m0s
verify (windows-latest)
The job has exceeded the maximum execution time of 6h0m0s