Skip to content

1.4b — CI gates: run smoke corpus + inspector-contract checks on PR #62

Description

@aarontrowbridge

Part of Phase 1.4 (Jack's Phase-1 kickoff, #amicode 2026-07-01). Complements #45 (VSIX gate): wire the smoke corpus (#61) into CI as a required PR gate, plus a contract check for the frozen RunInspector message/DOM schema (Jack's freeze step 2).

This is the enforcement layer for the run-dir contract — the required gate is the home for every producer↔consumer guard on that contract. Checks are added to the required set as each lands (this issue is not blocked on the ones still in flight).

Gate scope (required checks)

Dependencies

Blocked-by: #61
Blocked-by: #45
Part-of: Phase 1 (1.4)

Metadata

Metadata

Assignees

Labels

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions