Skip to content

R1: Reframe 4-week focus as strength not limitation #122

@kathsherratt

Description

@kathsherratt

Reviewer 1 Comment:

323-236: I actually think the focus on just WIS over 4-weeks is a strength of this work. Exploring different ways to evaluate forecasts (e.g., over longer time horizons) requires us to have a question in mind (e.g., are we forecasting farther into the future to figure out peak timing and size?). I think you need to establish the relevant questions first before expanding this work to include longer horizons and different target quantities.

Metadata

Metadata

Assignees

No one assigned

    Type

    No type
    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions