If the user wants to process landuse for different dates, it should be possible to do that without either overwriting or skipping if the specified lanuse is already processed. Instead, a column such as built-area_{date} should be added to the resulting layer.
If the user wants to process landuse for different dates, it should be possible to do that without either overwriting or skipping if the specified lanuse is already processed. Instead, a column such as
built-area_{date}should be added to the resulting layer.