This repository was archived by the owner on Feb 24, 2025. It is now read-only.
Replies: 2 comments 5 replies
-
|
Fixed percent and won't be changed. |
Beta Was this translation helpful? Give feedback.
2 replies
-
|
But it doesn’t work properly! The paths are all over the place, often ride outside of the field and the trailers are never close enough to the combine in large fields such as the US maps and the oaks. Either we need to be able to alter settings or it needs fixing. AD paths work superb for unloading just they haven’t fixed the issue with on the move or when a combine is in the slot, so obviously trailer path and positioning can be better |
Beta Was this translation helpful? Give feedback.
3 replies
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
-
After getting fed up with AD not fixing it's combine mode, I've started to play more and more using CP for unloading which for the most part is working well. However, on large fields the combine does not precall the trailer until around 75%. Is there a way to achieve this? as otherwise the combine fillip and then stops when it's nearly full as it takes a long time for the trailer to get there.
Beta Was this translation helpful? Give feedback.
All reactions