Skip to content

Latest commit

 

History

History
34 lines (27 loc) · 1.44 KB

phase9_gating.md

File metadata and controls

34 lines (27 loc) · 1.44 KB

Phase 9 Gate: Migration Plan and Pilot Rollout

Overview

  • Phase 9 defines safe incremental migration; pilot with parity-enabled features.
  • This document defines the gates, acceptance criteria, and sign-off workflow for Phase 9.

Gate Criteria (Pass/Fail)

Gate Criterion Verification Status
9.1 Migration plan complete: feature toggles, pilot scope, rollback paths MIGRATION_PLAN.md exists with all sections ✅ PASS
9.2 Pilot runbooks created: enablement, monitoring, rollback procedures Pilot runbooks documented in MIGRATION_PLAN.md ✅ PASS
9.3 Phase 9 documentation complete: runbook exists, scorecard updated PHASE9_RUNBOOK.md created, parity scorecard filled ✅ PASS

Migration Readiness

Component Status Rollback Tested
Streaming ✅ Ready ✅ Yes
Telemetry ✅ Ready ✅ Yes
Security ✅ Ready ✅ Yes
MCP/Tools ✅ Ready ✅ Yes
Memory ✅ Ready ✅ Yes
UI/Theming ✅ Ready ✅ Yes
Ecosystem ✅ Ready ✅ Yes
Governance ✅ Ready ✅ Yes

Sign-off

  • Phase 9 Owner signs off and moves to Phase 10.
  • Any gate not met requires corrective plan before Phase 10.

Mitigations and Escalation

  • If any gate cannot be met within the agreed window, escalate to governance board with corrective plan.
  • Document blockers in phase9_blockers.md.